The first day duty is pick up an engineers from other countries. Usually they are coming from Korea, China and Malaysia. Acquiring VISA in advance is required to meet the construction due date.
[picture 1. Mexico city airport terminal 1 and terminal2]
[picture 2. Mexico city airport terminal 1 and terminal2 layout]
No. | Subject | Author | Date | Views |
---|---|---|---|---|
9 | Day 9 Attach Angle for the ceiling | lcdrepair | 2021.12.11 | 74 |
8 | Day 8 Airshower Installation | lcdrepair | 2021.12.11 | 43 |
7 | Day 7. Finish the Ceiling | lcdrepair | 2021.12.11 | 50 |
6 | Day 6. Attach Angle for the Ceiling | lcdrepair | 2021.12.11 | 43 |
5 | Day 5 Make Locker | lcdrepair | 2021.07.27 | 96 |
4 | Day4 Make air returns on the wall | lcdrepair | 2021.05.14 | 131 |
3 | Day3 Cut Sandwitch and Build Wall | lcdrepair | 2021.05.14 | 139 |
2 | Day 2 Check parts and buy H beam | lcdrepair | 2021.05.14 | 128 |
» | Day 1 Engineer Pick up | lcdrepair | 2021.05.14 | 138 |