Checking and arranging parts were required. Alliance provides double ceiling and double wall structure to increase the efficiency. For better performance, access floor and vertical air flow system is required. For the purpose of maintenance, we recommended 4 meters of height.
No. | Subject | Author | Date | Views |
---|---|---|---|---|
9 | Day 9 Attach Angle for the ceiling | lcdrepair | 2021.12.11 | 74 |
8 | Day 8 Airshower Installation | lcdrepair | 2021.12.11 | 43 |
7 | Day 7. Finish the Ceiling | lcdrepair | 2021.12.11 | 50 |
6 | Day 6. Attach Angle for the Ceiling | lcdrepair | 2021.12.11 | 43 |
5 | Day 5 Make Locker | lcdrepair | 2021.07.27 | 96 |
4 | Day4 Make air returns on the wall | lcdrepair | 2021.05.14 | 131 |
3 | Day3 Cut Sandwitch and Build Wall | lcdrepair | 2021.05.14 | 139 |
» | Day 2 Check parts and buy H beam | lcdrepair | 2021.05.14 | 128 |
1 | Day 1 Engineer Pick up | lcdrepair | 2021.05.14 | 138 |