On the 7th day of the consturction, we finsihed ceiling on the locker room and intermediate room
[Picture] From the top of the cleanroom

| No. | Subject | Author | Date | Views |
|---|---|---|---|---|
| 9 | Day 9 Attach Angle for the ceiling | lcdrepair | 2021.12.11 | 86 |
| 8 | Day 8 Airshower Installation | lcdrepair | 2021.12.11 | 63 |
| » | Day 7. Finish the Ceiling | lcdrepair | 2021.12.11 | 71 |
| 6 | Day 6. Attach Angle for the Ceiling | lcdrepair | 2021.12.11 | 58 |
| 5 | Day 5 Make Locker | lcdrepair | 2021.07.27 | 114 |
| 4 | Day4 Make air returns on the wall | lcdrepair | 2021.05.14 | 147 |
| 3 | Day3 Cut Sandwitch and Build Wall | lcdrepair | 2021.05.14 | 152 |
| 2 | Day 2 Check parts and buy H beam | lcdrepair | 2021.05.14 | 140 |
| 1 | Day 1 Engineer Pick up | lcdrepair | 2021.05.14 | 155 |